Case Study: Distribution Center

Distribution Center Site Design
Mobile, AL

CCE designed plans for a new 2.6 million square foot import facility on a 400 acre site located in Mobile County, Alabama.

CCE completed all permitting with the local authorities and ADEM. The project design consisted of almost 300 loading docks, parking for over 2,200 trailers and 640 employees, two onsite fueling stations, and an onsite hydrogen fueling station for forklifts.

Prior to completing the design, CCE was engaged to assist our Client in their site selection process. This involved the preparation of multiple conceptual site plans for various properties in three states, completing code research, evaluating permitting time lines and preparing costs estimates. CCE also completed preliminary wetlands studies for the final three sites to aide in the selection process.